Report Overview


Notice: Undefined variable: post in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 69

Notice: Trying to get property 'ID' of non-object in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 69

Deals not quite done: 5G spectrum auction final results


Notice: Undefined variable: newDownloads in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 132

Notice: Undefined variable: post_id in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 138

Notice: Undefined index: pdf in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 157

Notice: Undefined variable: link in /home/virtinalabs/public_html/venture.virtinalabs.net/wp-content/themes/septera-plus/woocommerce/single-report.php on line 386

Contents

Spectrum auction assignment stages are normally fairly dull and routine, but due to the two-part nature of the 5G auctions, and the critical importance of proximity and contiguity, this is not the case with 5G

The assignments won, combined with the Vodafone/O2 deal, ensures that all the operators enjoy at least 80MHz of (essential) proximity, but only O2 gets (nice-tohave) contiguity

Further swaps could ensure contiguity for all, but this requires H3G to co-operate, which is in its absolute, but not relative, best interests

 

Figures and Tables

Spectrum allocation in the 3.4-3.8 GHz band pre-auction

Spectrum allocation post-auction, pre-O2/Vodafone trade

Spectrum allocation post-auction, post-O2/Vodafone trade

Spectrum allocation with full contiguity scenario